Project Summary:

Vinton construction was a subcontractor on this $15 million asphalt mill and overlay project on IH 41 from De Pere to Wrightstown. Vinton’s work consisted of new concrete pavement on the CTH U NB off Ramp, new concrete bridge approaches and Concrete repair and replacement on IH 41.

Contract Amount:

$15,311,894.00

Project Length:

10 Miles

By the Numbers:

  • 4300 SY of 8” to 12-inch Concrete Pavement
  • 5400 SY of 12” Concrete Base
  • 2400 SY of Base Patching SHES
  • 1300 SY of Concrete Pavement Repair and Replacement SHES